Dimensional standards
Servicing
- Applies near
- Main Street, Maple Avenue
- Geographic extent
- Main Street and Maple Avenue
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Curb cutGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. location on Main Street
On Main Street - Where a lot has frontage to multiple streets or other forms of access to a street other than Main Street, no curb cut shall be permitted on Main Street.
- Curb cutGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. pedestrian path
Where curb cuts are provided, they must include a safe, convenient, and accessible pedestrian path or marking where it crosses the sidewalk.
- Loading area location
Where provided, no loading areas shall be located between the street wall and the street line of Main Street or Maple Avenue.
- Pedestrian access from parking areas
Clearly delineated pedestrian areas (painted, raised sidewalks, etc.) shall be provided connecting all parking areas with more than ten spaces to the adjacent sidewalk and building entrances shall be provided.
Signage
- Pole and pylon signs
Pole and pylon signs are not permitted.
From the ordinance
Pole and pylon signs are not permitted. Clearly delineated pedestrian areas...