Prince William County Unincorporated, Virginia · General provision
Sec. 32-300.11.5
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum duration for temporary dwelling during construction18 months
Temporary use of existing dwellings or modular or mobile homes shall only be permitted for a maximum of 18 months
From the ordinance
Temporary use of existing dwellings or modular or mobile homes shall only be permitted for a maximum of 18 months, subject to issuance of zoning approval and deposit of adequate bond or guarantee to ensure diligent construction or reconstruction of a principal dwelling and removal of the temporary dwelling or modular or mobile home.