Sec. 90-1042(g)
Dimensional standards
Uses
Conditional / special use1
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
Tier 2 battery energy storage systems shall comply with the building height limitations for principal structures of the underlying zoning district.
Noise
- Maximum noise level at property line20 dBA
The average noise generated from the battery energy storage systems ... shall not exceed a noise level of 20 dBA as measured at the outside wall the property line of any surrounding non-participating residence or occupied community building in the R-A and A Zoning Districts.
Other
- Decommissioning plan and fund required
The applicant shall submit a decommissioning plan ... and continuously maintain the fund or bond payable to the County of Prince George.
- Security fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.7 ft
Tier 2 battery energy storage systems, including all mechanical equipment, shall be enclosed by a seven-foot-high security type fence with a self-locking gate.
- Screening and visibility minimization
Tier 2 battery energy storage systems shall have views minimized from adjacent properties to the extent reasonably practicable using architectural features, earth berms, landscaping, or other screening methods.
- SetbackSetbackThe distance a building must be held back from a lot line. from property lines
Tier 2 battery energy storage systems shall comply with the setback requirements of the underlying zoning district for principal structures or 100 feet, whichever is greatest.
- Clearance of combustible vegetation20 ft
Areas within 20 feet on each side of tier 2 battery energy storage systems shall be cleared of combustible vegetation and other combustible growth.
From the ordinance
Tier 2 battery energy storage systems are permitted through the issuance of a special exception by the board of supervisors within the M-1, M-2, M-3, A-1 and R-A zoning districts, and shall be subject to the special exception application process, the USBC, and the site plan application requirements set forth in this section.