Sec. 90-943
Uses
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Electrical connection required
Safe temporary connection to the electrical utility system is made in accordance with the uniform statewide building code.
- Health and sanitation required
All health and sanitary regulations of the county and the state departments of health shall be observed.
- Mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. facilities required
Only mobile homes containing sleeping accommodations, a flush toilet, and a tub or showerbath shall be occupied as living quarters.
- Maximum renewal period36 months
Such temporary permit may be renewed two times for a period of 12 months each for a maximum of 36 months...
- Temporary permit term12 months
A temporary permit is issued for a period of 12 months only upon showing by the applicant of a valid and approved building permit...
- YardYardThe open space left between a building and its lot line — the space a setback creates. requirements apply
All yard requirements of the district in which the mobile home or travel trailer is located shall be observed.
From the ordinance
In any district in which mobile homes or travel trailers are permitted as temporary uses, the zoning administrator may grant a temporary permit for the location, placement and use of a mobile home or travel trailer subject to the following conditions: ...