Sec. 90-824
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Chesapeake Bay Preservation Area notations
Site plan shall include: Chesapeake Bay Preservation Areas, notation of pump-out of on-site sewage treatment systems every five years, 100% reserve drainfield, 100-foot undisturbed buffer in Resource Protection Area, only water dependent facilities or redevelopment in RPA.
- Erosion and sediment control plan for gradingGrading (cut & fill)Reshaping land by removing earth (cut) or adding it (fill), often capped by volume. >2500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000. or 1000 cubic yardscubic yard (cy)A unit of earth volume used in grading limits — roughly one dump-truck scoop.2,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
An erosion and sedimentation control plan and detail sheet shall be submitted for site developments involving the grading disturbance of greater than 2500 square feet of area or 1,000 cubic yards of material.
- Minor site plan process for 2,500-10,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Minor Site Plan Approval Process: Site Land Disturbance or a Building Addition of 2,500—10,000 square feet which meets the following qualifications: no public water/sewer extensions, no significant drainage, no significant access changes, no subdivision, no change of use.
- Site plan approval expiration (5 years)5 years
Approval of a final site plan pursuant to the provisions of this article shall expire five years from the date of approval in accordance with Code of Virginia, § 15.2-2261, as amended, unless a building permit and/or a zoning permit has been obtained for the development.
- Site plan required for structures >4 residential units or non-agricultural4 units
A site plan shall be required for all structures which contain more than four residential units or are for other than agricultural purposes.
- Stormwater management plan required
A detailed storm water management plan and calculations shall be submitted. The county engineer shall determine the requirements for such plans.
From the ordinance
A site plan shall be required for all structures which contain more than four residential units or are for other than agricultural purposes.