Prince George County Unincorporated, Virginia · General provision
Sec. 90-821
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Drainage facilities in James River watershed
All necessary drainage facilities shall be provided within the James River watershed to ensure compliance with the water quality standards contained in the Chesapeake Bay Preservation Area Designation and Management Regulations (VR 173-02-01) based on the best management practices efficiencies shown in appendix C of the Chesapeake Bay local assistance department's local assistance manual for lots created prior to April 1, 1995.
- Zoning permit required
Buildings or structures shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator.
From the ordinance
Buildings or structures shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator.