Powhatan County Unincorporated, Virginia · General provision

Sec. 83-445(c) (Manufactured home use pending construction of conventional dwelling)

Uses

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Location requirement

    The temporary manufactured home dwelling shall be placed on the same lot as the dwelling being constructed, rebuilt, or remodeled, or on an adjoining lot that the applicant owns or possesses exclusive leasehold rights to during the permit period.

  • If placed on the same lot as the dwelling being constructed, rebuilt, or remodeled, the temporary manufactured home dwelling is exempt from the minimum lot area standards of this chapter, provided approval by the county health department is obtained.

  • Permit duration2 years

    Any permit authorizing the temporary manufactured home dwelling shall be conditioned on the permit being valid for a two-year period, subject to extensions in accordance with Article II, Administration.

From the ordinance

A manufactured home dwelling may be used temporarily while the occupant constructs, rebuilds, or remodels a conventional dwelling as a primary residence, in accordance with the following standards: ...
Sec. 83-445(c) (Manufactured home use pending construction of conventional dwelling)