Powhatan County Unincorporated, Virginia · General provision
Sec. 83-432(d)(7)a
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from all lot lines100 ft
An electrical power facility, substation, or transmission station shall be set back at least 100 feet from all lot lines.
From the ordinance
An electrical power facility, substation, or transmission station shall be set back at least 100 feet from all lot lines.