4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum floor area625 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Each temporary trailer shall not exceed one story in height and 625 square feet of floor area.
- Maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. in storiesStoreysHabitable floor levels. Whether a basement or attic counts is defined by the local code.1 storiesStoreysHabitable floor levels. Whether a basement or attic counts is defined by the local code.
Each temporary trailer shall not exceed one story in height and 625 square feet of floor area.
- Permit duration180 days
The permit for a temporary trailer shall be for no more than 180 days, subject to a single renewal for up to 180 days, but in no circumstances may a single project have a temporary trailer for more than 360 days in any 24-month period.
The temporary trailer shall be subject to the minimum setbacks of the zoning district in which it is located.
From the ordinance
Each temporary trailer shall not exceed one story in height and 625 square feet of floor area.