Sec. 98-877
Dimensional standards
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Environmental
- Maximum crown cover harvest in landward 50 feet50 pct
the zoning administrator may approve harvesting 50 percent of the crown cover within the landward 50 feet of the Resource Protection Area buffer
- No tree harvesting in Chesapeake Bay Resource Protection Areas
No tree harvesting shall occur within Chesapeake Bay Resource Protection Areas including the 100-foot resource protection area buffer.
- Resource Protection Area buffer100 ft
including the 100-foot resource protection area buffer
Other
- Erosion and sedimentation control plan
Where stump removal, grubbing, or other soil disturbing activities are proposed in conjunction with tree harvesting, except those preparations for reforestation that are in accordance with the approved forest management plan, an erosion and sedimentation control plan shall be submitted to and approved by the county prior to commencement of any soil disturbing activity.
- Forest management plan required
All forestry operations shall be in accordance with a forest management plan approved by the state department of forestry.
- Minimum parcel size5 acresacre43,560 square feet — about the size of an American football field without the end zones.
A parcel of five acres or greater shall be required for forestry operations.
From the ordinance
A parcel of five acres or greater shall be required for forestry operations.