New Kent County Unincorporated, Virginia · General provision
Sec. 98-5
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Permit validity period1 year
The use for which the zoning permit is issued shall be commenced within one year of the date of the permit.
- Survey required for land disturbing activity over 2,500 sq ftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.2,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Each application for a zoning permit involving land disturbing activity in excess of 2,500 square feet, shall be accompanied by a copy of a survey completed by a certified land surveyor, professional engineer or landscape architect.
- Zoning permit required for all development
All buildings, structures, signs or other uses of property shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the zoning administrator.
From the ordinance
All buildings, structures, signs or other uses of property shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the zoning administrator.