Nelson County Unincorporated, Virginia · General provision

Article 22, Section 22-4

Dimensional standards

Servicing

Geographic extent
All zoning districts in Nelson County

Uses

Permitted by right1

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Lighting

  • Artificial lighting restriction

    A small wind energy system shall not be artificially lit unless such lighting is required by the Federal Aviation Administration (FAA).

Noise

  • Compliance with noise control ordinance

    Small wind energy systems shall comply with Chapter 8, Article II, Noise Control, of the Nelson County Code.

Other

  • Abandonment period12 months

    A small wind energy system that is out of service for a continuous twelve-month period will be deemed to have been abandoned.

  • Building permit required

    A building permit is required for all small wind energy systems.

  • Nonreflective, unobtrusive color

    The color of the small wind energy system shall be a nonreflective, unobtrusive color that blends in with the surrounding environment.

  • Permit expiration if not installed24 months

    The small wind energy system is not installed and functioning within twenty-four (24) months from the date the permit is issued

  • Proof of adequate liability insurance

    The applicant shall provide proof of adequate liability insurance for a small wind energy system.

  • The tower shall be designed and installed so as not to provide step bolts or a ladder readily accessible to the public for a minimum height of twelve (12) feet above the ground.

  • Minimum setbackSetbackThe distance a building must be held back from a lot line. from property lines, roads, and overhead utility lines

    A small wind energy system shall be set back a minimum distance equal to one hundred ten (110) percent of the extended tower height or the building-mounted extended height from property lines, public and private roads, and overhead utility lines.

  • Underground electrical interconnection lines

    All electrical interconnection or distribution lines shall be underground and comply with all applicable codes and public utility requirements.

  • Utility company notification

    No interconnected customer-owned wind generator shall be installed until evidence has been given that the utility company has been informed of the customer's intent.

  • Zoning permit required

    A zoning permit approved by the Planning and Zoning Director shall be required for the installation of a small wind energy system.

Signage

From the ordinance

A small wind energy system shall be permitted in all zoning districts, subject to certain requirements as set forth below.
Article 22, Section 22-4