Dimensional standards
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Open spaceOpen spaceLand a development must leave unbuilt, sometimes required to be usable or planted. per converted unit600 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
When a structure is converted into three dwelling units, a minimum of 600 square feet of usable open space shall be provided. Thereafter, an additional 600 square feet of usable open space shall be provided for each additional dwelling unit
- Recreation facility hours of operation
The hours of operation for outdoor recreation facilities shall not exceed 7:00 a.m. to 11:00 p.m.
- Max distance to recreation space600 ft
At least 90 percent of all dwelling units shall be within 600 feet (by normal pedestrian routes) of countable recreation space.
- Active recreation space per additional unit250 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
thereafter, 250 square feet of active recreation area per each additional unit
- Active recreation space per unit500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
500 square feet of active recreation space is provided per unit for the first 200 units
From the ordinance
Public water and sewer are required for multifamily developments. For each multifamily development not less than 25 percent of the gross area shall be in open space.