Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period12 months
Any solar energy facility that has not operated for a period of 12 months shall be considered unused and abandoned.
- Maximum panel heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.15 ft
If the solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the panel height shall not exceed 15 feet.
- Minimum panel clearance above grade4 ft
The lowest surface of any panel shall be a minimum of four feet above the finished grade on which the panel is located.
- Removal period after notice6 months
The owner of an unused facility shall remove the entire system within six months of receipt of notice from the town manager notifying the owner of the equipment removal requirement.
From the ordinance
If the solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the panel height shall not exceed 15 feet. The lowest surface of any panel shall be a minimum of four feet above the finished grade on which the panel is located.