Section I. - Site Protection and General Planting Requirements
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Debris removal deadline30 days
All stumps and other tree parts, litter, brush, weeds, excess or scrap building materials or other debris shall be removed from the site within thirty (30) days of notification by the zoning administrator and disposed of in accordance with the law.
- Maximum slope ratio for ground cover3 ratio
all roadway slopes steeper than one foot vertically to three (3) feet horizontally shall be planted with ground cover appropriate for the purpose and the soil conditions, water availability and environment.
- Minimum topsoil depth4 in
Topsoil moved during the course of construction shall be redistributed on all re-graded surfaces so as to provide at least four (4) inches of even cover to all disturbed areas of the development and shall be stabilized by seeding and planting.
- Minimum tree caliper at planting2 in
Deciduous trees shall have at least a two-inch caliper at planting.
- Protective barrier heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.4 ft
They shall be a minimum of four (4) feet high and constructed of a durable material that will last until construction is completed.
- Shrub protection distance4 ft
No material or temporary soil deposits shall be placed within four (4) feet of shrubs or ten (10) feet of trees designated on the landscape plan to be retained.
- Tree protection distance10 ft
No material or temporary soil deposits shall be placed within four (4) feet of shrubs or ten (10) feet of trees designated on the landscape plan to be retained.
From the ordinance
Topsoil moved during the course of construction shall be redistributed on all re-graded surfaces so as to provide at least four (4) inches of even cover to all disturbed areas of the development and shall be stabilized by seeding and planting.