Martinsville, Virginia · General provision
Section I. Bonding and construction permits
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Foundation survey required within setbackSetbackThe distance a building must be held back from a lot line.5 ft
located within five (5) feet of any required setback
- Land disturbance permit threshold5,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Issuance of a land disturbance permit (for projects with greater than five thousand (5,000) square feet of disturbed land area).
- Maintenance bond percentage10 pct
in no instance shall be less than ten (10) percent of the total construction cost of the improvements subject to the bond.
- Maintenance bond period2 years
The maintenance bond may be released at the end of two (2) years from the date of city acceptance of responsibility.
- Minimum bond period12 months
The period of the initial bond (surety) agreement shall be not less than twelve (12) months from its effective date.
From the ordinance
The period of the initial bond (surety) agreement shall be not less than twelve (12) months... maintenance bond ... less than ten (10) percent... land disturbance permit (for projects with greater than five thousand (5,000) square feet... located within five (5) feet of any required setback