Dimensional standards
Servicing
- Applies near
- floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. areas
- Geographic extent
- Existing structures in floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. areas
Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- Existing structures must conform when changed
Any structure or use of a structure or premises must be brought into conformity with these provisions when it is changed, repaired, or improved unless one of the following exceptions is established before the change is made:
- Exception: changes less than 50% of structure value in 5 years50 pct
The change, when added to all the changes made during a rolling five-year period, does not constitute 50 percent of the structure's value;
- Exception: compliance with ordinance and VA USBC
The change complies with this ordinance and the VA USBC;
- Exception: required for health or safety violation
The changes are required to comply with a citation for a health or safety violation;
- Exception: historicHistoric districtAn area where exterior changes need design review to protect its character. structure
The structure is a historic structure and the change required would impair the historic nature of the structure.
- Exception: no new noncompliant square footage
No new square footage is being built in the floodplain that is not compliant;
- Exception: no new square footage in floodway
No new square footage is being built in the floodway;
- Exception: not substantial repair or improvement
The change is not a substantial repair or substantial improvement;
From the ordinance
Any structure or use of a structure or premises must be brought into conformity with these provisions when it is changed, repaired, or improved unless one of the following exceptions is established before the change is made: