Dimensional standards
Servicing
- Geographic extent
- Areas on the FIRM for which one-percent annual chance flood elevations have been provided and the floodway has not been delineated.
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- CLOMR required for development increasing flood elevation by more than one foot
Development activities in zones A1-30 and AE or AH on the town's FIRM which increase the water surface elevation of the base flood by more than one foot may be allowed, provided that the applicant first applies, with the town's endorsement, for a conditional letter of map revision, and receives the approval of FEMA.
- No development unless cumulative effect does not increase flood elevation more than one foot
No new construction, substantial improvements, or other development (including fill) shall be permitted unless it is demonstrated that the cumulative effect of the proposed development... will not increase the water surface elevation of the base flood more than one foot.
From the ordinance
Until a regulatory floodway is designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the areas of special flood hazard, designated as zones A1-30 and AE or AH on the FIRM, unless it is demonstrated that the cumulative effect of the proposed development... will not increase the water surface elevation of the base flood more than one foot at any point within the town.