Loudoun County Unincorporated, Virginia · General provision

10.04.A.2, 10.04.A.3, 10.04.B.6, 10.04.G.1, 10.04.G.4.a

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum duration of temporary special event14 days

    Temporary special events are limited to a maximum duration of 14 consecutive days, unless otherwise specifically authorized or extended by the Zoning Administrator.

  • Temporary zoning permit application advance time30 days

    Except for a Temporary Fire and/or Rescue Station, all temporary Zoning Permits must be applied for at least 30 days in advance of the event or function.

  • Zoning Permits are not required for accessory structures under 30 inches in height and less than 20 square feet in area, fences, and stormwater management improvements, unless located within the Floodplain Overlay District (FOD), Mountainside Overlay District (MOD), Limestone Overlay District (LOD), Historic Overlay District (HOD), River and Stream Corridor Resource (RSCR), or Steep Slopes Areas

  • Zoning Permits are not required for agriculture uses, unless access by the public is a part of such use or if such use is located within FOD, MOD, LOD, RSCR, or Steep Slopes Areas

  • Zoning permit validity1 year

    Issued Zoning Permits become invalid if the authorized work is not commenced within 1 year of the date of issuance; or is suspended or abandoned for a continuous period of 1 year.

From the ordinance

Zoning Permits are not required for accessory structures under 30 inches in height and less than 20 square feet in area... Issued Zoning Permits become invalid if the authorized work is not commenced within 1 year... Temporary special events are limited to a maximum duration of 14 consecutive days.
10.04.A.2, 10.04.A.3, 10.04.B.6, 10.04.G.1, 10.04.G.4.a