Section 9.02
Dimensional standards
Servicing
- Geographic extent
- Countywide, applies to UHNUs provided as part of certain applications (Zoning Map Amendment, Special Exception, Site Plan, etc.)
Extracted standards
14 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for SFA and MFS UHNUs as percentage of adjacent market-rate heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.90 pct
SFA and MFS UHNUs are permitted to have a height that is a minimum of 90% of the height of SFA or MFS market rate dwelling units adjacent to the sides of the UHNU or UHNU lot.
- Minimum width for SFA UHNUs14 ft
SFA UHNUs must have a 14-foot minimum width.
- SFD UHNUs must have same number of storiesStoreysHabitable floor levels. Whether a basement or attic counts is defined by the local code. as adjacent market-rate
SFD UHNUs must have the same number of stories as the market rate dwelling units adjacent to the sides of the UHNU or UHNU lot.
- Minimum UHNU depth as percentage of adjacent market-rate depth75 pct
SFD, SFA, and MFS UHNUs are permitted to have depth that is a minimum of 75% of the average depth of ... market-rate dwelling units adjacent to the sides of the UHNU or UHNU lot.
- Maximum number of SFA/MFS UHNUs abutting other SFA/MFS UHNUs2 units
No more than 2 SFA and MFS UHNUs are permitted to abut other SFA and MFS UHNUs, respectively.
- SFD UHNUs not adjacent to other SFD UHNUs
SFD UHNUs must not be located on lots adjacent to other SFD UHNUs.
- Maximum percentage of SFA/MFS units in a building that can be UHNUs41 pct
No more than 41% of the SFA and MFS dwelling units in an SFA or MFS building are permitted to be UHNUs.
- Extended sales price control period for UHNUs50 years
an UHNU extended control period thereafter applies until the expiration of 50 years after such recordation.
- Initial sales price control period for UHNUs20 years
Sales prices for UHNUs for purchase must be controlled for a period of at least 20 years after recordation of the deed from the initial sale of such UHNU.
- Rent control period for UHNUs30 years
Rents for rental UHNUs must be controlled for a period of at least 30 years from the date of the issuance of the Certificate of Occupancy for each for rent UHNU.
- 100% of UHNUs must have CO before 90% of market-rate COs100 pct
Certificates of Occupancy for 100% of the UHNUs must be issued prior to issuance of more than 90% of the Certificates of Occupancy for market rate dwelling units in the development.
- 50% of UHNUs must have CO before 50% of market-rate COs50 pct
Certificates of Occupancy for 50% of the UHNUs must be issued prior to issuance of more than 50% of the Certificates of Occupancy for market rate dwelling units in the development.
- 75% of UHNUs must have CO before 75% of market-rate COs75 pct
Certificates of Occupancy for 75% of the UHNUs must be issued prior to issuance of more than 75% of the Certificates of Occupancy for market rate dwelling units in the development.
- Minimum UHNU width as percentage of adjacent market-rate width70 pct
SFD, SFA, and MFS UHNUs are permitted to have a width that is a minimum of 70% of the average width of ... market-rate dwelling units adjacent to the sides of the UHNU or UHNU lot.
From the ordinance
UHNUs must be compatible with and interspersed among market rate dwelling units in the development. ... The sale and rental price control periods ... are replaced with ... at least 30 years for rent, 20 years initial for purchase, extended to 50 years.