Loudoun County Unincorporated, Virginia · General provision

Section 9.02

Dimensional standards

Extracted standards

13 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • AMI range for UHNUs

    0% to 30% of area median income (AMI), and 70% to 100% of AMI

  • Maximum abutting SFA/MFS UHNUs2 count

    No more than 2 SFA and MFS UHNUs are permitted to abut other SFA and MFS UHNUs

  • Maximum adjacent SFD UHNUs0 count

    SFD UHNUs must not be located on lots adjacent to other SFD UHNUs

  • Maximum percentage of SFA/MFS UHNUs in a building41 pct

    No more than 41% of the SFA and MFS dwelling units in an SFA or MFS building are permitted to be UHNUs

  • Minimum depth of UHNU relative to adjacent market-rate units75 pct

    depth that is a minimum of 75% of the average depth

  • SFA and MFS UHNUs are permitted to have a height that is a minimum of 90% of the height of ... market rate dwelling units

  • Minimum width for SFA UHNU14 ft

    SFA UHNUs must have a 14-foot minimum width

  • Minimum width of UHNU relative to adjacent market-rate units70 pct

    SFD, SFA, and MFS UHNUs are permitted to have a width that is a minimum of 70% of the average width of ... market-rate dwelling units

  • Purchase price control period for UHNUs20 years

    Sales prices for UHNUs for purchase must be controlled for a period of at least 20 years after recordation of the deed from the initial sale

  • Rent control period for UHNUs30 years

    Rents for rental UHNUs must be controlled for a period of at least 30 years from the date of the issuance of the Certificate of Occupancy

  • UHNUs before 50% market50 pct

    Certificates of Occupancy for 50% of the UHNUs must be issued prior to issuance of more than 50% of the Certificates of Occupancy for market rate dwelling units

  • UHNUs before 75% market75 pct

    Certificates of Occupancy for 75% of the UHNUs must be issued prior to issuance of more than 75% of the Certificates of Occupancy for market rate dwelling units

  • UHNUs before 90% market100 pct

    Certificates of Occupancy for 100% of the UHNUs must be issued prior to issuance of more than 90% of the Certificates of Occupancy for market rate dwelling units

From the ordinance

To Unmet Housing Needs Units (UHNUs) provided as part of an application for a Zoning Map Amendment, Zoning Concept Plan Amendment, Special Exception, Site Plan, Subdivision, or Preliminary Subdivision to comply with one or more of the following: a. To achieve an adjusted FAR in the TDSA of the TRC Zoning District ... b. As a permitted adaptive reuse ... c. As required when the residential density exceeds 20 dwelling units per acre in the PD-MUB Zoning District ... d. To fulfill proffers
Section 9.02