Section 4.06.03
Extracted standards
9 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Blasting hours
All blasting is limited to the hours of 7:00 a.m. to 6:00 p.m.
- Minimum tract size for extraction permit50 acresacre43,560 square feet — about the size of an American football field without the end zones.
No permit for an extraction and mining use will be issued for any tract of land containing less than 50 acres.
- Maximum peak over pressure from blast129 dB
The peak over pressure (noise) from any blast is limited to 129 dB.
- Maximum continuous airborne noise80 dBA
Airborne noise produced from extractive operations other than blasting must not exceed the 80 dBA maximum.
- Office and administration setbackSetbackThe distance a building must be held back from a lot line. from MR-HI boundary50 ft
Buildings devoted solely to office and administrative uses must be set back a minimum of 50 feet from the MR-HI Zoning District boundary.
- Other structures setbackSetbackThe distance a building must be held back from a lot line. from MR-HI boundary200 ft
Other structures related to extraction operations must be set back a minimum of 200 feet from the MR-HI Zoning District boundary.
- Pit wall setbackSetbackThe distance a building must be held back from a lot line. from MR-HI boundary1,000 ft
The pit wall of a quarry must be set back at least 1,000 feet from the MR-HI Zoning District boundary.
- Processing equipment setbackSetbackThe distance a building must be held back from a lot line. from MR-HI boundary500 ft
Structures enclosing processing equipment must be set back a minimum of 500 feet from the MR-HI Zoning District boundary.
- Maximum earth vibration from non-blasting sources0.03 inches per second
Earth vibration produced from sources other than blasting must not exceed a maximum resultant peak particle velocity of 0.03 inches per second.
From the ordinance
Stone quarrying uses must meet the following additional Use-Specific Standards...