Loudoun County Unincorporated, Virginia · General provision
Section 4.07.09
SubstationAll Loudoun County Unincorporated districts0
Dimensional standards
Lot
Servicing
- Applies near
- Rural Economy Cluster Lots
- Applies within
- 100 ft
- Geographic extent
- Permitted on Rural Economy Cluster Lots by Special Exception; not on Residential Cluster, Preservation Farm, or Common Open SpaceOpen spaceLand a development must leave unbuilt, sometimes required to be usable or planted. Lots. SetbackSetbackThe distance a building must be held back from a lot line. 100 ft from adjacent residential development.
Uses
Permitted by right1
Conditional / special use1
- utility substations requiring special exception in AR Cluster Subdivisions
Accessory1
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Required buffer type
All Utility Substations and accessory storage yards require a minimum Buffer Type C...
- Commission Permit required
A Commission Permit (10.09) is required for a Utility Substation unless the Utility Substation is specifically delineated in the Comprehensive Plan.
- Private road access allowed
Utility Substations may be accessed by a private road.
From the ordinance
The minimum lot size of a Utility Substation is 1 acre exclusive of major floodplain. ... Utility Substations must be set back a minimum of 100 feet from adjacent property with existing residential development...