Loudoun County Unincorporated, Virginia · General provision

Section 4.07.02.B

Dimensional standards

lot requirementsSTREETMIN LOT AREA3 ac
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Buffer Type C with earthen berm

    In lieu of the buffer required under Table 7.04.03-1, a Buffer Type C is required with the specified plantings, and located on an earthen berm that has a minimum height of 6 feet and a grade lower than 2:1.

  • Decommission plan required

    As part of the first submission of the Site Plan for the facility, the applicant must provide a detailed decommission plan acceptable to the Zoning Administrator.

  • The facility project area must not be located within 1/3 mile of a historic resource as defined by this Zoning Ordinance.

  • Fence with locked gate

    A fence approved by the Fire Marshal and/or Building Official with a locked gate or other approved barrier must be provided to keep the public at least 10 feet from the outer Energy Storage Facility container, including mobile energy storage systems.

  • Fire apparatus access distance150 ft

    Horizontal access to all points of individual or grouped containers must not exceed 150 feet from any approved fire apparatus access roadway.

  • Containers housing energy storage equipment are limited to 900 square feet in size or the maximum size that promulgated by the most current NFPA 855 Standard.

  • Minimum container separation10 ft

    Energy Storage Facility containers placed as a group of 2 or more must be separated by a minimum of 10 feet or that distance required in the most current NFPA 855 standard, whichever is greater.

  • Unless a more restrictive setback within the underlying zoning district or road corridor applies, all components of the Energy Storage Facility must be set back a distance of: [table not shown]

  • UL 9540 certification

    Any Energy Storage Facility equipment must be listed by a nationally recognized testing laboratory to UL 9540 or approved equivalent.

From the ordinance

The minimum project area must be 3 acres.
Section 4.07.02.B