Loudoun County Unincorporated, Virginia · General provision
Section 4.06.03.C.3
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Setback
- Minimum other extraction structure setbackSetbackThe distance a building must be held back from a lot line. from GB/CLI/GI50 ft
When abutting the GB, CLI, or GI Zoning District boundary, the minimum setback from the MR-HI Zoning District boundary is 50 feet
- Minimum other extraction structure setbackSetbackThe distance a building must be held back from a lot line. from MR-HI200 ft
A minimum of 200 feet from the MR-HI Zoning District boundary.
- Minimum other extraction structure setbackSetbackThe distance a building must be held back from a lot line. from road100 ft
A minimum of 100 feet from all public roads within the zoning district.
From the ordinance
Other structures related to extraction operations, including scale houses and storage yards, must be set back as follows: A minimum of 200 feet from the MR-HI Zoning District boundary. Exception. When abutting the GB, CLI, or GI Zoning District boundary, the minimum setback from the MR-HI Zoning District boundary is 50 feet; and A minimum of 100 feet from all public roads within the zoning district.