Loudoun County Unincorporated, Virginia · General provision
Section 4.06.03.C.2
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Setback
- Minimum processing equipment setbackSetbackThe distance a building must be held back from a lot line. from MR-HI500 ft
Structures enclosing processing equipment associated with an extraction operation, including crushers, conveyors, washers, and screeners, must be set back a minimum of 500 feet from the MR-HI Zoning District boundary
- Minimum processing equipment setbackSetbackThe distance a building must be held back from a lot line. from non-county200 ft
except where the operation is adjacent to land not under County zoning authority, such as IAD or an incorporated town, the minimum setback may be reduced to 200 feet by Special Exception approval
From the ordinance
Structures enclosing processing equipment associated with an extraction operation, including crushers, conveyors, washers, and screeners, must be set back a minimum of 500 feet from the MR-HI Zoning District boundary