Section 2.06.04
Dimensional standards
Height & bulk
Servicing
- Geographic extent
- Should be located within the Suburban Industrial/Mineral Extraction, Transition Industrial/Mineral Extraction, or Leesburg JLMA Industrial/Mineral Extraction Place Types as shown on the respective Place Types Maps in the General Plan, and must be located where necessary to allow extraction of existing mineral resources or expansion of existing or associated mineral extraction uses.
Uses
Prohibited1
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- Maximum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for non-habitable quarry structures120 ft
Non-habitable structures associated with a quarry operation are permitted to 120 feet in height provided they are set back from property lines and Zoning District boundaries an additional setback of 2 feet for each 1 foot in height above 45 feet.
Other
- Minimum zoning districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. size600 acresacre43,560 square feet — about the size of an American football field without the end zones.
The initial MR-HI Zoning District size must be a minimum of 600 acres.
- Stone quarrying special exception required
The establishment of any new stone quarrying operations or the expansion of any existing stone quarrying operations beyond previously granted approvals in the MR-HI Zoning District requires Special Exception approval
Setback
- No parking/loading between structures and agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them./residential districts
No areas for parking, outdoor storage, refuse collection, and loading are permitted between structures and such agricultural or residential Zoning Districts or existing or planned residential uses where such uses are visible from said Zoning Districts or uses.
- Additional setbackSetbackThe distance a building must be held back from a lot line. for quarry structures above 45 feet
an additional setback of 2 feet for each 1 foot in height above 45 feet
From the ordinance
The initial MR-HI Zoning District size must be a minimum of 600 acres.