Loudoun County Unincorporated, Virginia · General provision
Section 5.09.05.09
Dimensional standards
Servicing
- Applies near
- Route 28
- Geographic extent
- Route 28 Corridor Optional Overlay DistrictOverlay districtA second set of rules laid over the base district, adding requirements without replacing it. (CO, CB, CI Districts)
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Stormwater retention for intensity bonus20 pct
A property owner may achieve an intensity bonus for stormwater management treatment that captures and retains on-site, through infiltration, re-use, and/or other best management practices, at least 20% of site runoff volume, based on the first inch of runoff.
From the ordinance
A property owner may achieve an intensity bonus for stormwater management treatment that captures and retains on-site, through infiltration, re-use, and/or other best management practices, at least 20% of site runoff volume, based on the first inch of runoff.