Section 5.09.01
Dimensional standards
Servicing
- Applies near
- Route 28
- Geographic extent
- Route 28 Corridor Optional Overlay DistrictOverlay districtA second set of rules laid over the base district, adding requirements without replacing it. (CO, CB, CI Districts)
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Alternative method of development
An alternative method is a style of development that is tied to incentives in the Route 28 Corridor Optional Overlay Districts. An alternative method development incorporates design standards (such as frontage types regulated in Sections 5.09.02 and 5.09.03 and amenities (such as parks and civic uses) as described in the optional overlay district regulations.
- Alternative method incentives
Election to proceed under a Route 28 Corridor Optional Overlay District without a Zoning Map Amendment; Longer time periods to build out a project without a zoning approval (such as a Zoning Permit, Site Plan, or Special Exception) expiring (Section 5.09.07.03); Flexibility, clarity, and predictability in the application of zoning standards such as setbacks, building height, and lot coverage; and Reductions in development standards requirements related to parking and buffering, elimination of the bulk plane standard, and an increase in floor area ratio and lot coverage.
- Standard method of development
Standard method is subject to the base optional overlay district standards and is not subject to the design standards that apply to the alternative method.
From the ordinance
Section 5.09.01, including the zoning district standards and development standards, applies only to development that elects to proceed under a Route 28 Corridor Optional Overlay District.