Loudoun County Unincorporated, Virginia · General provision

Section 5.09.01

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Election to develop under Route 28 not permitted after Dec 13, 2023

    Election to develop under the Route 28 Corridor District is not permitted after December 13, 2023.

  • Two development methods: Standard and Alternative

    The optional overlay districts include 2 types of development. Standard Method development includes basic use, building height, setback and floor area ratio (FAR) standards. Alternative Method development allows higher FAR and lot coverage, along with process streamlining and other regulatory incentives, along with design controls and amenities that do not apply to standard method development.

From the ordinance

Election to develop under the Route 28 Corridor District is not permitted after December 13, 2023.
Section 5.09.01