Loudoun County Unincorporated, Virginia · General provision
Section 3.04.B
Uses
Permitted by right5
- construction and sales trailers
- temporary stockpiling
- temporary dwelling unit in conjunction with construction of a dwelling
- sales and leasing
- model homes
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Removal of temporary structures as condition of final bond release
Temporary buildings or structures must be removed as a condition of final bond release.
- Certificate of Occupancy required for model home
Any model home must obtain a Certificate of Occupancy prior to Residential occupancy.
- Maximum duration of temporary dwelling unitDwelling unitOne independent home: its own kitchen, bathroom and entrance.12 months
May be erected and occupied for up to 12 months. The Zoning Administrator, at his discretion, may extend in 6-month increments;
- Removal of temporary dwelling after completion1 months
Must be removed within 1 month of the completion of construction of the permanent dwelling.
From the ordinance
Erection of temporary buildings or structures, including but not limited to, construction and sales trailers and storage of materials are permitted in conjunction with the construction of buildings and infrastructure or other land development, when limited to the duration of the construction.