Loudoun County Unincorporated, Virginia · General provision
Section 3.04.B.3
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum temporary dwelling duration12 months
May be erected and occupied for up to 12 months.
- Removal after completion1 months
Must be removed within 1 month of the completion of construction of the permanent dwelling.
From the ordinance
A temporary dwelling unit is permitted during the construction of a permanent dwelling... May be erected and occupied for up to 12 months. The Zoning Administrator, at his discretion, may extend in 6-month increments; and Must be removed within 1 month of the completion of construction of the permanent dwelling.