Lexington, Virginia · General provision

§ 420-11.5C(3)(a)

Dimensional standards

Extracted standards

30 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Micro-wireless facility permit exempt

    The installation, placement, maintenance or replacement of micro-wireless facilities that are suspended on cables or lines that are strung between existing utility poles shall not require any permit from the City

  • Small cell facility additional fee (per facility)50 usd

    The fee for processing small cell facility applications shall be $100 for each application proposing up to five small cell facilities and $50 for each additional small cell facility proposed on a permit application.

  • Small cell facility application fee (up to 5 facilities)100 usd

    The fee for processing small cell facility applications shall be $100 for each application proposing up to five small cell facilities and $50 for each additional small cell facility proposed on a permit application.

  • Small cell facility decision period60 days

    All such completed applications, as determined by the Director of Planning, shall be approved or disapproved within 60 days of receipt of the complete application.

  • Small cell facility decision extension period30 days

    The sixty-day period may be extended by the locality, in writing, for a period not to exceed an additional 30 days.

  • Small cell facility max per application35 count

    An applicant may submit up to 35 permit requests on a single application.

  • Small cell facility removal after disuse3 months

    At such time that the small cell ceases to be used for communications purposes for three consecutive months, the applicant shall remove the small cell from the property.

  • Small cell facility removal notice period30 days

    If the applicant fails to remove the small cell within 30 days of written notice from the Zoning Administrator

  • Administrative review decision period (new structure)150 days

    For a new structure within the lesser of 150 days of receipt of the completed application or the period required by federal law for such approval or disapproval

  • Administrative review decision period (co-location)90 days

    For the co-location of any wireless facility that is not a small cell facility, within the lesser of 90 days of receipt of a completed application, or the period required by federal law for such approval.

  • Administrative review fee500 usd

    The fee for processing administrative-review-eligible projects shall be $500

  • Application completeness notice period10 days

    Within 10 days after receipt of an application and a valid electronic mail address for the applicant, the locality shall notify the applicant by electronic mail whether the application is incomplete

  • Application deemed approved if no action

    A completed application shall be deemed approved if the Director of Planning fails to approve or disapprove the application within the periods specified above or any agreed extension thereof.

  • Balloon test may be required

    A balloon test at the proposed site may also be required at the discretion of the Planning Director or designee.

  • Co-location map radius2 mi

    the applicant shall indicate on a map the location of all existing towers, and all buildings and structures suitable for the proposed communication facilities within a two-mile radius of the proposed communication tower site

  • Co-location radius for limiting new structures500 ft

    Nothing in this section shall be interpreted to prohibit the City from limiting the number of new structures or the number of wireless facilities that can be installed within a 500-foot radius of an existing wireless support structure

  • Disapproval explanation required

    Any disapproval of the application shall be in writing and accompanied by an explanation for the disapproval

  • Disapproval record release period30 days

    Be supported by substantial record evidence contained in a written record publicly released within 30 days following the disapproval.

  • Nothing in this section shall be interpreted to prohibit the denial of an application if the proposed height of any wireless support structure, wireless facility, or wireless support structure with attached wireless facilities exceeds 50 feet above ground level.

  • Multiple use required when feasible

    Multiple use of communication towers required whenever feasible.

  • NIER compliance statement required

    A statement from a registered engineer that the NIER (nonionizing electromagnetic radiation) emitted from the communication tower...does not result in an exposure at any point on or outside such facility which exceeds the lowest applicable exposure standards

  • Towers, guys, and accessory facilities must satisfy the minimum zoning district setback requirements for primary structures.

  • Tower setbackSetbackThe distance a building must be held back from a lot line. from off-site residential structure400 ft

    Towers must be set back a distance equal to 200% of the height of the tower from any off-site residential structure and in no case less than 400 feet.

  • Towers must be set back a distance equal to 200% of the height of the tower from any off-site residential structure and in no case less than 400 feet.

  • Structural certification required

    Certification by the manufacturer or an engineering report by a state-registered structural engineer shall be submitted indicating the communication tower or antenna height, design, structure, installation and total anticipated capacity

  • Temporary tower for emergency allowed

    For use in an emergency situation during the activation of the City's Emergency Operations Center.

  • Temporary tower for maintenance (max days)60 days

    A permit shall be obtained from the Zoning Administrator authorizing the COW for a maximum of 60 days, which period may be extended at the discretion of the Zoning Administrator.

  • Temporary tower for special event (max days)7 days

    For special events not to exceed seven days under a special event permit approved by the City of Lexington.

  • Visual study required

    A visual study depicting all areas the proposed facility would be visible from and what the appearance would be, including photo-simulations.

  • Tower wind resistance110 mph

    the proposed communication tower will be constructed to withstand 110-mile-per-hour winds.

From the ordinance

Towers must be set back a distance equal to 200% of the height of the tower from any off-site residential structure and in no case less than 400 feet.
§ 420-11.5C(3)(a)