Leesburg, Virginia · General provision

Sec. 12.8.1

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Enlargement threshold triggering buffer-yard requirements50 pct

    The buffer-yard requirements of this section shall apply to all new construction, including Site Plan Waiver and enlargement of existing structures constituting more than fifty percent (50%) of the floor area of the existing structure.

From the ordinance

The buffer-yard requirements of this section shall apply to all new construction, including Site Plan Waiver and enlargement of existing structures constituting more than fifty percent (50%) of the floor area of the existing structure.
Sec. 12.8.1