2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Landscaping & trees

  • Tree canopy credit factor for requirements of 15% or greater2 factor

    Credit will be given at 2 times the full diameter of the tree's drip line for sites with a tree canopy requirement of 15% or greater.

  • Tree canopy credit factor for requirements of 10% or less1.5 factor

    Credit will be given as 1.5 times the full diameter of the tree's drip line for sites with tree canopy requirements of 10% or less.

From the ordinance

Credit will be given as 1.5 times the full diameter of the tree's drip line for sites with tree canopy requirements of 10% or less. ... Credit will be given at 2 times the full diameter of the tree's drip line for sites with a tree canopy requirement of 15% or greater.