Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Maximum temporary signs
One temporary on-site sign, advertising the activity and two on-site directional signs for ingress and egress may be permitted.
From the ordinance
One temporary on-site sign, advertising the activity and two on-site directional signs for ingress and egress may be permitted in accordance with this Zoning Ordinance.