Leesburg, Virginia · General provision

7.12.2 District Created

Dimensional standards

Servicing

Applies near
East Market Street, West Market Street, North King Street, South King Street, Edwards Ferry Road
Applies within
15 ft
Geographic extent
Five segments along East Market Street, West Market Street, North King Street, South King Street, and Edwards Ferry Road as shown on Official Zoning Map; on developed residential lots, extends no more than 15 feet from right-of-way line

Extracted standards

20 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Lighting

Other

  • Accessory structures, such as storage sheds or garages, shall be constructed out of traditional materials including wood, stone, brick or other historically compatible masonry materials

  • Any accessory structure that is 400 gross square feet or less and single story may be reviewed administratively by the Preservation Planner.

  • Blank Walls Prohibited

  • Buildings oriented toward street

    Buildings that have frontage on a public or private street shall be oriented toward, and approximately parallel to, the street.

  • Certificate of Appropriateness required for construction or alteration

    No building, structure, or site feature subject to the provisions of Sec. 7.12 Gateway District (Overlay) shall be constructed or altered, until its owner has applied for and received a Certificate of Appropriateness

  • Corner lots require two front facades

    If the building is on a corner lot, it shall have two front facades, each architecturally addressing its respective street.

  • Demolition of 40% or more of exterior wall/roof requires Certificate of Demolition40 pct

    Any removal of forty percent (40%) or more of the total exterior wall or roof surface of any building shall require a Certificate of Demolition

  • Attached dwellings existing as of date of enactment exempt

    Attached dwellings (including townhouses and duplexes) existing as of the date of enactment of this overlay district;

  • Fences constructed of traditional materials (wood or metal)

    Fences shall be constructed using traditional design and materials, including wood or metal

  • Finished side of fence faces out

    The finished side of a fence shall face out from the property with the frame of the fence facing the inside.

  • Four-sided architecture required

    Any building constructed in the Gateway District shall be characterized by four-sided architecture.

  • Certificate of Appropriateness lapses if construction not commenced within 2 years2 years

    Construction has commenced within two years (24 months) from the date the Certificate of Appropriateness was issued

  • Off-street loading docks, dumpsters, utility meters screened from public street

    Off-street loading docks, dumpsters, utility meters, waste and/or recycling receptacles shall be located either internally or at the side or rear of buildings and shall not be directly visible from a public street.

  • Regular maintenance or in-kind repair exempt

    Regular maintenance or in-kind repair of structures, buildings, or signs (as opposed to alteration);

  • Mechanical equipment screened from public view

    Mechanical equipment... located on the site shall be screened from public view.

  • Final decision within 75 days75 days

    The Preservation Planner or the Board of Architectural Review, as the case may be, shall render a final decision within seventy-five (75) days or less

  • The provisions of this section shall not apply to any of the following: ... Single-family detached dwellings;

Parking

From the ordinance

The Gateway District (Overlay) is hereby established as an overlay on the Official Zoning Map... with boundaries to include all or parts of parcels as shown on the aforesaid Official Zoning Map.
7.12.2 District Created