Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Transitional yardYardThe open space left between a building and its lot line — the space a setback creates. required when abutting lower intensity districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.
A transitional yard shall be required in any zoning district when that district abuts or adjoins a zoning district of lower intensity, and shall be measured from the zoning district line to produce a transitional yard of at least minimum depth in accordance with the following chart:
From the ordinance
A transitional yard shall be required in any zoning district when that district abuts or adjoins a zoning district of lower intensity, and shall be measured from the zoning district line to produce a transitional yard of at least minimum depth in accordance with the following chart: