Lawrenceville, Virginia · General provision

10-5-2

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Design storm frequency10 years

    The design of all drainage improvements shall be based on runoff to be anticipated from a ten-year frequency storm

From the ordinance

The design of all drainage improvements shall be based on runoff to be anticipated from a ten-year frequency storm, or greater if conditions necessitate, based on conditions before development with no increase in the rate of runoff after development.
10-5-2