King William County Unincorporated, Virginia · General provision
Sec. 86-153
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum processing structure size4,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Any structure used for the processing of the feedstock into energy occupies less than 4,000 square feet
- Minimum feedstock produced on site50 pct
At least 50 percent of the feedstock is produced either on site or by the owner of the conversion equipment
- SetbackSetbackThe distance a building must be held back from a lot line. from public road100 ft
The facility is setback 100 feet from any public road
- SetbackSetbackThe distance a building must be held back from a lot line. from residence not on same parcel400 ft
The facility is setback 400 feet from any residence not located on the same parcel, religious assemblies, public or private schools, and other public-owned facilities
- SetbackSetbackThe distance a building must be held back from a lot line. from residential or business districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.200 ft
The facility is setback 200 feet from any residential or business district
From the ordinance
Small-scale conversion of biomass: at least 50% feedstock produced on site; structure less than 4,000 sq ft; setback 100 ft from public road; 200 ft from residential/business district; 400 ft from residence not on same parcel.