Sec. 86-38
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Building permit validity6 months
When issued, such permit shall be valid for a period of six months unless a longer period of time is specified thereon in accord with the terms of this chapter.
- Manufactured homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. permit required
No manufactured home or trailer for any purpose shall be placed for occupancy at any location inside a manufactured home park without the owner or owners first having obtained a placement permit therefor from the zoning administrator.
- Zoning permit required
No building permit, manufactured home permit, or occupancy permit shall be issued by the building official unless the zoning administrator first shall have issued a zoning permit which acknowledges that the proposed use, structure, or building complies with the provisions of this chapter or authorized variance therefrom.
From the ordinance
No building permit, manufactured home permit, or occupancy permit shall be issued by the building official unless the zoning administrator first shall have issued a zoning permit...