Isle Of Wight County Unincorporated, Virginia · General provision
Sec. 5-5002.N
Dimensional standards
Density
- Maximum units
- 1
Uses
Permitted by right1
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Permit expiry for new construction24 months
All permits issued for temporary residence while constructing a new replacement residence shall expire within two (2) years after the date of issuance.
- Permit expiry for repair12 months
All permits for temporary residences, while repairing a permanent residence shall expire within one (1) year after the date of issuance.
- Removal days after certificate of occupancy30 days
All temporary manufactured homes must be removed at least thirty (30) days after a final certificate of occupancy has been issued.
From the ordinance
A manufactured home, Class B may be allowed as a temporary residence during the construction, repair, or renovation of a permanent residential structure