Sec. 4-13001-4-13006
Dimensional standards
Uses
Permitted by right40
- Agricultural farm equipment sales and service
- Agricultural farm product processing, warehousing and distribution service
- Agricultural feed, seed, and farm supply service
- Agricultural service/agent
- Forestry operation, silvicultural and/or timbering
- Greenhouse, commercial and/or nursery
- Sawmill
- Administrative service
- Adult care center
- Park and ride facility
- Public maintenance and service facility
- Public safety service
- Transit station
- Utility service/minor
- General office
- Auction establishment
- Boating and fishing facilities
- Business or trade school
- Construction office, temporary
- Construction sales and service
- Contractor office and storage facility
- Equipment sales and rental
- Garden center
- Micro-brewery, distillery, cidery
- Mini-warehouse
- Motor vehicle/outdoor storage
- Wholesale sales
- Abattoir or livestock processing
- Brewery, distillery, cidery
- Construction yard
- Industry, Type I
- Industry, Type II
- Meat packing
- Recycling center
- Refuse and recycling center
- Sawmill, commercial
- Shipping container
- Transfer station
- Warehousing and distribution
- Amateur radio tower
Conditional / special use23
- Agriculture
- Aquaculture
- Aquaculture, waterfront business
- Commercial feedlot
- Livestock auction market
- Viticulture
- Correctional facility
- Utility service/major
- Asphalt/concrete plant
- Industry, Type III
- Landfill, industrial
- Landfill, rubble
- Resource extraction
- Scrap and salvage service
- Towing service storage yard
- Aviation facility, commercial
- Aviation facility, general
- Aviation facility, private
- Communication tower
- Parking facility, surface/structure
- Reconstructed wetland
- Shooting range, outdoor
- Turkey shoot
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Noise
- Sound study required
A sound study shall be required with the submittal of the application for the industrial use.
Other
- Earthen berm heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.10 ft
There shall be an earthen berm with a minimum height of ten (10) feet installed in the required setback between the residential use and the industrial use...
- Building separation for structures over 35 ft30 ft
Where structures exceed the thirty-five-foot height requirement a building separation of thirty (30) feet shall be required.
- Rows of evergreen landscaping3 rows
a minimum of three (3) rows of staggered evergreen landscaping planted a maximum of ten (10) feet on center.
Setback
- SetbackSetbackThe distance a building must be held back from a lot line. increase for heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. over 35 ft1 ft per ft
The side and rear yard setbacks for any structure in excess of thirty-five (35) feet in height shall be increased one (1) foot for each additional foot of structure height over thirty-five (35) feet.
- Front setbackSetbackThe distance a building must be held back from a lot line. in industrial park50 ft
Industrial uses shall meet a setback of one hundred (100) feet from the right-of-way of any existing street which abuts or borders the use, except that uses located within a designated industrial park of twenty (20) acres or more shall meet a setback of fifty (50) feet from any street right-of-way.
- SetbackSetbackThe distance a building must be held back from a lot line. from residential subdivision100 ft
For parcels directly adjacent to an existing residential subdivision of at least five (5) lots recorded on the same plat as of July 1, 2025, the minimum setback for new industrial uses consisting of one (1) building shall be one hundred (100) feet and two hundred (200) feet for industrial uses with two (2) or more buildings...
From the ordinance
General industrial conservation district: min lot area 20,000 sq ft, max height 75 ft, front setback 100 ft for industrial, side/rear 20 ft.