Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Demolition debris removal time30 days
Such bond shall be payable to the city for the protection against damages to adjoining properties and to ensure that all material and rubbish is removed from a site within thirty (30) days from date of completion of the demolition of such building.
From the ordinance
Such bond shall be payable to the city for the protection against damages to adjoining properties and to ensure that all material and rubbish is removed from a site within thirty (30) days from date of completion of the demolition of such building.