Hillsville, Virginia · General provision

Article XXI, Wireless Telecommunications Facilities

Dimensional standards

Servicing

Geographic extent
Applies to all wireless telecommunications facilities within the Town of Hillsville.

Uses

Conditional / special use1

Extracted standards

57 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

  • Co-location capacity5 additional antennas

    The tower shall be structurally designed to accommodate at least five additional antenna arrays

  • Stealth technology required

    the utilization of stealth or concealment technology as may be required by the Town

Other

  • Abandonment period before removal90 days

    abandoned (i.e., not used as wireless telecommunications facilities) for a period exceeding 90 consecutive days or a total of 180 days in any three-hundred-sixty-five-day period

  • Abandonment sale period10 days

    if the owner... does not claim and remove it from the site to a lawful location within 10 days

  • Access road and parking required

    an access road, turnaround space and parking shall be provided to assure adequate emergency and service access

  • Adherence to state and federal rules

    the holder of such a special exception permit shall adhere to, and comply with, all applicable rules, regulations, standards, and provisions of any state or federal agency

  • Notification to adjacent municipalities

    Written notification of the application shall be provided to the legislative body of all adjacent municipalities

  • Application fee for co-location2,000 dollars

    the nonrefundable fee shall be $2,000

  • Application fee for new tower5,000 dollars

    a nonrefundable application fee of $5,000

  • Automobile coverage1,000,000 dollars per occurrence

    Automobile coverage: $1,000,000 per occurrence/$2,000,000 aggregate

  • Balloon test advertisement days14 days

    advertised by the applicant seven and 14 days in advance

  • Balloon test diameter3 ft

    a minimum of a three feet in diameter

  • Balloon test duration4 hours

    The balloon shall be flown for at least four consecutive hours

  • Balloon test requirements

    The applicant shall arrange to fly, or raise upon a temporary mast, a brightly colored balloon, a minimum of a three feet in diameter, at the maximum height of the proposed new tower. The balloon shall be flown for at least four consecutive hours sometime between 7:00 a.m. and 4:00 p.m.

  • Co-location negotiation required

    The owner of the proposed new tower... shall negotiate in good faith for the shared use of the proposed tower

  • Co-location handled administratively

    an application to co-locate on an existing tower or similar structure that does not increase the height by extending above the top of the structure shall be handled administratively.

  • Commercial general liability coverage1,000,000 dollars per occurrence

    Commercial general liability covering personal injuries, death and property damage: $1,000,000 per occurrence/$2,000,000 aggregate

  • Compliance with technical and safety codes

    shall construct, operate, maintain, repair... in strict compliance with all current applicable technical, safety and safety-related codes

  • Construction completion period6 months

    Any wireless telecommunications facility that is permitted shall be constructed, completed and provide service no later than six months from the date of the grant of the initial permit.

  • Environmental assessment may be required

    An applicant may be required to submit an environmental assessment analysis and a visual addendum.

  • Initial escrow deposit8,500 dollars

    The initial deposit shall be $8,500.

  • Escrow replenishment amount5,000 dollars

    so that it has a balance of at least $5,000

  • Escrow replenishment threshold2,500 dollars

    If at any time during the process this escrow account has a balance less than $2,500, the applicant shall immediately... replenish said escrow account so that it has a balance of at least $5,000.

  • Fine for first offense350 dollars per day

    punishable by a fine not exceeding $350 per day per occurrence

  • Fine for second offense700 dollars

    for conviction of a second offense... punishable by a fine of not less than $350 nor more than $700

  • Fine for third offense1,000 dollars

    for a third or subsequent offense... punishable by a fine of not less than $700 nor more than $1,000

  • Grounding and surge protection

    the wireless telecommunications facilities will be effectively grounded and bonded so as to protect persons and property and installed with appropriate surge protectors.

  • Imminent danger correction period24 hours

    the Town may... order the violation remedied within 24 hours.

  • Indemnification required

    Any application for wireless telecommunications facilities that is proposed for Town property... shall contain a provision with respect to indemnification.

  • Inspection authority

    the Town may inspect all facets of said permit holder's... placement, construction, modification and maintenance

  • Insurance cancellation notice30 days

    at least 30 days' prior written notice in advance of the cancellation

  • Insurance delivery after permit15 days

    no case later than 15 days after the grant of the special exception permit

  • Insurance renewal notice15 days

    Renewal or replacement policies or certificates shall be delivered to the Town at least 15 days before the expiration

  • Landowner notification distance1,500 ft

    the application shall contain the names and addresses of all landowners whose property is located within 1,500 feet of any property line of the lot or parcel

  • Annual NIER certification

    The holder of the special exception permit shall, annually, certify to the Town that NIER levels at the site are within the threshold levels adopted by the FCC.

  • Performance bond amount75,000 dollars

    in an amount of at least $75,000

  • Pre-application meeting required

    There shall be a pre-application meeting.

  • notice of which shall be published in the official newspaper of the Town no less than 10 calendar days prior to the scheduled date of the public hearing

  • Prior to the approval of any application for a special exception permit for a new tower... a public hearing shall be held

  • Recertification fee0 dollars

    No application fee is required in order to recertify

  • Recertification interval5 years

    prior to the fifth anniversary of the original granting of the special exception permit, and prior to each subsequent five-year anniversary

  • Removal completion period90 days

    within 90 days of receipt of written notice

  • Removal notice period90 days

    shall dismantle and remove such wireless telecommunications facilities... within 90 days of receipt of written notice

  • Removal notice period48 hours

    the Town shall notify the holder of the special exception permit... within 48 hours

  • Revocation notice period48 hours

    shall notify the holder of the special exception permit within 48 hours of such action.

  • Screening of base and facilities

    how it shall effectively screen from view the base and all related facilities and structures

  • Response time for shared use request60 days

    Respond within 60 days to a request for information from a potential shared-use applicant.

  • Special exception permit required

    No person shall be permitted to site, place, build, construct, modify or prepare any site for the placement or use of wireless telecommunications facilities... without having first obtained a special exception permit

  • Compliance with changed state/federal rules24 months

    shall conform the permitted wireless telecommunications facilities to the applicable changed and/or modified rule... within a maximum of 24 months

  • Structural certification

    the telecommunications facility, foundation and attachments are designed and will be constructed to meet all local, Town, state and federal structural requirements for loads, including wind and ice loads.

  • Temporary use permit duration90 days

    the Town may approve a temporary use permit/agreement for the wireless telecommunications facilities, for no more than 90 days

  • Temporary use permit for removal90 days

    the Town may approve a temporary use permit/agreement for the wireless telecommunications facilities, for no more than 90 days

  • Set back from abutting parcels, recorded rights-of-way and road and street lines by the greater of the height of the tower plus 10% of height, or the existing setback requirement of the underlying zoning district.

  • Underground utilities required

    All utilities at a wireless telecommunications facilities site shall be installed underground

  • Violation correction period7 days

    the violations must be corrected within seven days

  • Visual impact assessment required

    The applicant shall furnish a visual impact assessment

Signage

From the ordinance

All proposed towers and any other proposed wireless telecommunications facility structures shall be set back from abutting parcels, recorded rights-of-way and road and street lines by the greater of the following distances: a distance equal to the height of the proposed tower or wireless telecommunications facility structure plus 10% of the height of the tower or structure, or the existing setback requirement of the underlying zoning district, whichever is greater.
Article XXI, Wireless Telecommunications Facilities