Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Front yardYardThe open space left between a building and its lot line — the space a setback creates. required on all frontages
there shall be a front yard as required by § 171-42, Table of Bulk Requirements, along each lot frontage.
From the ordinance
On double frontage and corner lots, as defined in § 171-8 of this chapter, there shall be a front yard as required by § 171-42, Table of Bulk Requirements, along each lot frontage.