Dimensional standards
Lot
Servicing
- Geographic extent
- No lot or parcel on which is located the site shall be less than one acreacre43,560 square feet — about the size of an American football field without the end zones. in size.
Uses
Permitted by right1
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Extensions3 extensions
Up to three one-year extensions granted by town council possible. No further extensions after third.
- Initial permit duration24 months
Not more than two years after the date of town council approval.
- Management
Maximum number of workers set in application, written operating procedures, maintenance, lawful activities, sufficient staff, one mobile food vendor max.
- Maximum number of sites1 site
No more than one assembly site, whether formal or informal, shall be permitted in the town.
- Minimum lot areaMinimum lot areaThe smallest parcel on which the district allows anything to be built.43,560 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
No lot or parcel on which is located the site shall be less than one acre in size.
- Site features
Shelter, potable water, toilets may be provided; gravel/concrete/asphalt surface for circulation; screening adjacent to residential.
From the ordinance
A temporary assembly site for day workers shall require approval of a special exception... The use shall be permitted by special exception for not more than two years after the date of town council approval, with up to three one-year extensions granted by town council possible. No more than one assembly site shall be permitted in the town. No lot or parcel on which is located the site shall be less than one acre in size.