Uses
Prohibited1
- Retail sales or display of goods, products, or services within the public right-of-way or on other town property except as part of a town-recognized event or as authorized by the town manager
Extracted standards
13 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Noise
- Noise limit
The temporary use shall not have substantial adverse or noise impacts on nearby residential uses or neighborhoods. All temporary uses or events that include the operation of amplified sound shall obtain approval as required by Article V, Chapter 26 of the Herndon Town Code.
Other
- Maximum events per year5 events
In no event shall the town issue a permit for a temporary use for a parcel or property already subject to five temporary use permits for five events, respectively, within a single calendar year.
- Hours of operation
9:00 a.m. to 7:00 p.m.; may extend to 11:00 p.m. with lighting plan
- No interference with principal use
Any temporary structures, including tents, shall be located so as to not interfere with the normal operations of any permanent use located on the property.
- No permanent alterations
Permanent alterations to the site are prohibited.
- Parking surface
All off-street parking shall occur on paved or graveled surfaces. Any parking surface added for the temporary use shall be removed within 30 days of the termination of the temporary use.
- Performance bond
If determined necessary by the zoning administrator, the applicant shall submit a performance bond or other financial guarantee to ensure removal and restoration.
- Permits and inspections
All inspections and permits required by applicable construction codes shall have been approved and passed.
- Public services
The applicant shall arrange for any security police, fire, trash removal, maintenance, or other public services the event, use or structure may require.
- Removal time48 hours
Structures and features associated with the temporary use shall be dismantled and the site shall be returned within 48 hours to its condition prior to the establishment of the temporary use.
- Sufficient area
The temporary use site shall be sufficient to accommodate the use or structure without encroaching into buffers, open space, landscaping, etc.
Parking
All temporary uses shall be provided convenient off-street parking spaces in sufficient number for the use, as determined by the zoning administrator with reference to section 78-100.
Signage
- Sign removal
All approved temporary signs associated with the temporary use shall be removed when the activity ends. No signs in public right-of-way.
From the ordinance
All temporary uses and structures shall meet the following general requirements... hours of operation limited to between 9:00 a.m. to 7:00 p.m.; ... no more than five temporary use permits per parcel per calendar year.
Parking requirements
{
"temporary_use": "sufficient off-street parking as determined by zoning administrator with reference to section 78-100"
}