Harrisonburg, Virginia · General provision

Sec. 10-3-208(4)

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Signage

  • Sign installation time limit6 months

    If a sign is not installed within six (6) months following the issuance of a sign permit, the permit shall be void.

  • Sign permit revocation conditions

    Materially false info, nonconforming installation, violation of law

From the ordinance

If a sign is not installed within six (6) months following the issuance of a sign permit, the permit shall be void. The city may revoke a sign permit under any of the following circumstances: 1) information materially false or misleading; 2) sign as installed does not conform to permit; 3) sign violates Zoning Ordinance, Building Code, or other law.
Sec. 10-3-208(4)