Dimensional standards
Servicing
- Geographic extent
- Citywide
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Building permit required
A building permit issued by the building and zoning office is required in advance of the initiation of construction of any building or structure.
- Certificate of occupancy required
A building hereafter erected under the expressed conditions of a building permit... shall not be occupied in whole or in part until a certificate of use and occupancy... has been issued.
- Maximum principal dwellings per lot1 dwelling
in no case shall there be more than one building on the lot used for dwelling purposes except as otherwise provided.
- No lot reduction below requirements
No lot shall be reduced in size so that width, yard requirements, lot area per dwelling unit or other requirements of this chapter are not maintained.
- Short-term rentalShort-term rentalA dwelling let to guests for brief stays — the zoning category behind Airbnb rules. violation penalty
Operating a short-term rental or homestay in violation of the Zoning Ordinance shall be punishable by a civil penalty of $100 for first offense, $200 for second, $500 for subsequent.
Signage
- Sign permit required
Erecting a sign prior to approval of a sign permit or other violation of article EE.
From the ordinance
Building permits required; certificate of occupancy required; no more than one dwelling per lot; no lot reduction; civil penalties for short-term rental and sign violations.